Page 8 - Khumani Mine topsoil stockpile report
P. 8

Khumani Iron Ore Mine

                                                     BKM Project

                                           Northern Cape, South Africa

                   Soil & Dust Solutions  Dust Control  Application to Topsoil Stockpile

                              Performance Report of October 2006 – 2012 – 2016

           Safety, Health and Environment

           The KM project offices are located approximately 400 m west of the stockpile area, due to the fall and
           angle  you  cannot  see  the  large  amounts  of  dust  emissions  that  affect  the  majority  of  the  offices,
           computers, and vehicles.  The resulting poor visibility causes safety and health concerns, limiting the
           quality of life in the workplace.  In addition there is an increased maintenance demand.

           Since the EBS application on the stock pile,  the effect on our offices related to the dust emissions
           from that area have been significantly reduced, thereby eliminating the safety risks due to no visibility,
           there is no more dust in the offices of the staff and in the computer's and kitchen area, and in general
           there's an overall improvement in the quality of the workplace environment.

           Summary

           The utilization of the Engineered Base Stabilizer (EBS) product applied topically for the stabilization
           and dust control of topsoil stockpiles has been shown to meet with, and indeed exceed the claims of
           Soil and Dust Solutions. The product was applied in October 2006 and as of September 2012 is still
           intact and upon visual inspection has shown no loss of material and flourishing vegetation.

           The EBS product supplied and applied by Soil and Dust Solutions, had a performance guarantee of 12-
           24 months and has shown that its performance meets or exceeds the suppliers claims, it is non-toxic, it
           prevents loss of material due to wind and water erosion, it allows flora to stabilise and grow, retains
           ground moisture, improves germination and it does not markedly alter the appearance of the stockpile
           and it is safe and easy to apply.  To date the product has performed successfully and seems to continue
           to do so after 6 years.


           O. Williams
           Pr.Tech.Eng
           Assmang Owners Team
           Construction Manager
           Khumani Mine
           BKM Project
           Tel: +27 (0) 82 491 2131
           owilliamsgti@hotmail.com



           See  ADDENDUM 1 – Visual Inspection conducted on August 31, 2016   - Ten Years after original
           EBS product Application with no additional applications being applied.








           Khumani Mine Stockpile Report Update 2016 .docx                                                   8