Page 6 - Khumani Mine topsoil stockpile report
P. 6

Khumani Iron Ore Mine

                                                     BKM Project

                                           Northern Cape, South Africa

                   Soil & Dust Solutions  Dust Control  Application to Topsoil Stockpile

                              Performance Report of October 2006 – 2012 – 2016





























                       Photo #6 Showing EBS / Soil binding matrix indicating the performance action
                                           (Showing EBS  Treated Side Slopes)
           September 2012

           A visit and inspection was conducted again during September 2012, exactly 6 years after the initial
           application of the EBS dust and erosion control product, the stockpile treated with the EBS product is
           completely intact and looks the same as it did during the last inspection in 2007, the tyre marks of
           the original vehicle used for spraying are still there and the vegetation is flourishing. The adjacent
           stockpile  that  was  not  treated  with  the  EBS  product  has  lost  most  of  the  material  to  wind  and
           waterborne erosion and is mostly a pile of rock. It is also important to note the Parsons East Access
           road treated with EBS in 2006 is also still intact bearing in mind that all mine traffic from LDV’s to
           heavy machinery and cranes have used this road to access the main mine and ROM stockpiles.
























                        Current Photo showing EBS Treated Stockpile With Original Vehicle Tracks




           Khumani Mine Stockpile Report Update 2016 .docx                                                   6