Soil Solutions was contacted by Rancho Santana’s Chief Engineer, Alan Vilchez, looking for a solution that would provide a smooth driving surface with reduced maintenance which was water resistant and most importantly would reduce the dust for better visibility for drivers and the safety of the community.
Read more →The project was managed by the Abu Dhabi Ministry of Culture and Tourism, who enlisted the services of Abu Dhabi based Scan Construction, who contacted Soil Solutions. The project consisted of – Stabilizing and Surface Sealing the Entrance and Access Road to the visitors point at the Monastery Site, the adjacent parking areas, walkways, and archeological excavation area.
Read more →An area of the Molege Road link to the Owo Township Road was selected to perform a demonstration with the Engineered Base Stabilizer (EBS) to show the advantages over the asphalt method.
Read more →