Soil Solutions was contacted by Rancho Santana’s Chief Engineer, Alan Vilchez, looking for a solution that would provide a smooth driving surface with reduced maintenance which was water resistant and most importantly would reduce the dust for better visibility for drivers and the safety of the community.
Read more →The project was managed by the Abu Dhabi Ministry of Culture and Tourism, who enlisted the services of Abu Dhabi based Scan Construction, who contacted Soil Solutions. The project consisted of – Stabilizing and Surface Sealing the Entrance and Access Road to the visitors point at the Monastery Site, the adjacent parking areas, walkways, and archeological excavation area.
Read more →Soil Solutions was tasked with designing, surveying and constructing a gravel airstrip for Limpopo-Lipadi, a private game and wilderness reserve.
Read more →The client was looking for a cost effective environmentally compliant sustainable solution for dust abatement and erosion control on one of their stockpiles.
Read more →The Ondo State Rural Access and Mobility Project at Molege village in Owo Local Government Area of Ondo State.
Read more →