The seven test sections constructed by Soil & Dust Solutions at ASSMANG BKM Khumani Iron Ore Mine in South Africa, under went the most extensive on site testing ever conducted on an alternative soil stabilizer. These results together with independent accredited laboratory testing conducted by Geostrada and Africon led to the contact to construct this mine haul road being awarded to Soil & Dust Solutions, as well as the Crusher Tip area (the largest Crusher tip in the southern hemisphere), which as of May 2009, had seen over 2.5 million tonnes of haulage with no wear or tear.