A stock pile treatment for dust control was conducted at ASSMANG Khumani Mine, whereby two adjacent stockpiles were documented, one was treated with a topical application of our Soil Stabilizer, while the other was left untreated. After three months 169 tonnes of material was lost from the untreated stock pile, no measurable material was lost from the treated areas, and in fact vegetation had grown. Full details of the independent monitoring including weather and wind conditions are available upon request in a compiled report which included three years of monitoring. Despite recommended maintenance applications every 18 months, none were applied and after 36 months the surface of the stockpile remained stabilized with a crust layer that continued to allow vegetation and provided effective dust control.
Contact us at info
soilsolutions [dot] com for effective dust control solutions today.