Soil & Dust Solutions provided total turn key services for the construction, layer works and dust control for the Mine Access road at the Crocodile Rive Mine in South Africa. The surface was shaped and prepared using a grader and then EBS was applied for the base layer construction using a Reclaimer , which allowed the 2km area to be completed in one day. A Surface Seal application provided a wearing course which was dust free and only required routine sweeping for maintenance.
Contact us at info
soilsolutions [dot] com for Engineered Solutions for mine haul road construction and dust control.